Imperial College London – Burlington Danes
The project comprised of the refurbishment of the level 3 Burlington Danes.
Scope of works included: Demolition of existing partitions, doorsets and redundant services; Modification of existing freezer room to create a new corridor link into the new facility; New screed throughout the project area to match floor level of existing adjacent rooms; Installation of new plasterboard & framed glazed partitions, new linings along external walls, new doorsets, new ceiling and flooring;
Installation of new lab furniture; Installation of 6 no. of Microbiological Safety Cabinets and 2 Fume Cupboards (ducted); Installation of new services, including new ducts, drainage, power, lab gases, ventilation, IT and lighting etc; Installation of Nitrogen tank adjacent to the Energy Centre; works included installation of new tank enclosure, relocated bin store, modification of existing pavement, underground services diversions and parking bay arrangement;
Installation of Helium Recovery system to Level 3 Bin area and Ground Floor Cylinder Store; Installation of an outdoor compressor unit to service gantry, works involve addition platform and secondary steel supports; Installation of an enclosure for UPS unit and new flues to level 6 Plant Room; Installation of 2no. flues in Fan Wells on level 6.
Client
Imperial College London
Project Manager
Henry Riley LLP
Principal Designer
Wilson Mason LLP
Services Engineer
AECOM
Project CDM Consultant
AM Safety Services Ltd
Value
£3.45m
Contract Period
19 wks