HCA PMC St John’s Wood
The project included works associated with the GF installation of reception/ concierge counter, with new reorientation and remodelling of back of house reception, office spaces and removal of existing site WC.
Works to the FF included the refurbishment/ replacement of the existing reception and circulation areas, including the creation of a corridor behind the existing reception desk. Reconfiguration of existing WC’s, creation of existing hand therapy and consulting room to form a new MDT and office area.
Widening existing corridor and the installation of a new nurse base and waiting space for patients. Protection, strip out works, partition alterations, mechanical and electrical alterations and upgrades and refurbishment of ceilings and flooring.
Client / Project Manager
HCA Healthcare UK
Architect
Sonnemann Toon Architects
Principal Designer
Sweco UK Ltd
Quantity Surveyor
Insight Ltd
Mechanical & Electrical Engineers
The Richard Stephens Partnership Ltd
Structural Consultant
Fairhurst
Value
£855k
Contract Period
14 wks





