HCA PMC St Johns Wood


PROJECT

HCA PMC St John’s Wood

Platinum Medical Centre GF & FF Refurbishment HCA Wellington Hospital

£855k

The project included works associated with the GF installation of reception/ concierge counter, with new reorientation and remodelling of back of house reception, office spaces and removal of existing site WC.

Works to the FF included the refurbishment/ replacement of the existing reception and circulation areas, including the creation of a corridor behind the existing reception desk. Reconfiguration of existing WC’s, creation of existing hand therapy and consulting room to form a new MDT and office area.

Widening existing corridor and the installation of a new nurse base and waiting space for patients. Protection, strip out works, partition alterations, mechanical and electrical alterations and upgrades and refurbishment of ceilings and flooring.

Client / Project Manager
HCA Healthcare UK

Architect
Sonnemann Toon Architects

Principal Designer
Sweco UK Ltd

Quantity Surveyor
Insight Ltd

Mechanical & Electrical Engineers
The Richard Stephens Partnership Ltd

Structural Consultant
Fairhurst

Value
£855k

Contract Period
14 wks