BMI Clinic Hampshire


PROJECT

BMI Clinic Hampshire

Refurbishment and extension of the first floor

£1.3m

The project comprised of the refurbishment of a section of office area on the first floor and the extension of the same floor into the rear car park.

The extension was built over at third floor level with an extension of the loft area to form the plant room. New drainage, mechanical / electrical and medical gas services were provided for the new area. When the new Endoscopy area was formed the existing area was removed at the final and second stage of the scheme.

Client
BMI Healthcare Ltd

Architect / Principal Designer
LSI Architects LLP

Project Manager / Quantity Surveyor
Holden & Lee

Services Engineer
JRB Environmental Design Ltd

Structural Engineers
Clancy Consulting Limited

Value
£1.3m

Contract Period
40 wks